2025 · Saskatchewan
IF56-Foran
Challenge
Full rock-anchor and foundation responsibility for the FORAN Mine transmission program across tough Canadian Shield terrain — surface rock and shallow bedrock within one to five metres of grade, with winter conditions that demanded disciplined staging and execution.
Access & terrain
Canadian Shield ROW with extensive surface rock and shallow bedrock. Foundations and anchors required heli-portable and hand-drill spreads, multiple track units, and winterized grout operations coordinated with the client.
Scope
- Drill and install foundations with custom heli drills and custom hand drills
- Install anchors with hand drills
- Support foundation and anchor work with custom heli compressors
- Stage multiple track units across the program
- Run winterized grout operations for anchors and foundations
Outcome
200+ structures delivered with zero incidents, finishing ahead of schedule — crews working efficiently with the client to get the job done safely, on time, and done right.