IF56-Foran transmission foundation work

Projects

Work that held the line

Selected transmission and related infrastructure work — remote access, demanding terrain, and foundations that hold.

Selected work

Proof in the pads

IF47 — 138 kV Remediation — SaskPower

2025 · Saskatchewan

IF47 — 138 kV Remediation — SaskPower

Forest fires took down structures on SaskPower’s IF47 138 kV line. Revolution Drilling remobilized a fully heli-portable crew to restore foundations and anchors so the corridor could return to reliable service.

Read case study →

Gateway West Transmission Line

2024 · Casper, Wyoming

Gateway West Transmission Line

High-voltage transmission foundation and anchor work on Gateway West near Casper — supporting new line construction across Wyoming terrain and seasonal weather.

Read case study →

Wataynikaneyap Transmission Project

2021–2022 · Northwest Ontario

Wataynikaneyap Transmission Project

Completion of the second phase to connect 17 First Nation communities north of Pickle Lake and Red Lake with an estimated 1,500 km of new transmission line. The project objective was connecting remote First Nation communities in Northwest Ontario — currently serviced by diesel generation that is financially unsustainable — and has been identified as a priority in Ontario’s Long Term Energy Plan.

Read case study →

Long Lake Hydro Transmission Line

2018 · North of Stewart, British Columbia

Long Lake Hydro Transmission Line

A 10 km, 138 kV line over the BC Coast Range connecting Long Lake hydro generation to the BC Hydro grid serving Stewart and surrounding areas.

Read case study →

Maritime Link Transmission Line

2017 · Newfoundland and Labrador to Nova Scotia

Maritime Link Transmission Line

A 200 kV HVDC line moving renewable electricity through rugged terrain and harsh weather from Granite Canal to Cape Ray — including the high-wind Wreck House area.

Read case study →

Northwest Transmission Line — Phase 2

2014 · Bob Quinn to Red Chris / Tatogga Lake, British Columbia

Northwest Transmission Line — Phase 2

Completion of the 287 kV line from Bob Quinn airstrip to Imperial Metals’ Red Chris Mine and communities around Tatogga Lake through isolated mountainous terrain.

Read case study →

Northwest Transmission Line — Phase 1

2013 · Terrace to Bob Quinn, British Columbia

Northwest Transmission Line — Phase 1

A 287 kV transmission line through northwest B.C. requiring guy anchors and tower foundations where access was limited and terrain unforgiving.

Read case study →

Lator 2 Gas Plant Construction

2015 · Alberta

Lator 2 Gas Plant Construction

Support construction of a liquids-rich natural gas processing plant and associated oil, NGL, sweet-gas, and sour-gas gathering facilities with precise foundation preparation.

Read case study →