2018 · North of Stewart, British Columbia
Long Lake Hydro Transmission Line
Challenge
A 10 km, 138 kV line over the BC Coast Range connecting Long Lake hydro generation to the BC Hydro grid serving Stewart and surrounding areas.
Access & terrain
Mountainous terrain requiring heli-portable equipment for foundation and anchor work.
Scope
- Plan and complete foundations in mountainous terrain
- Drill, install, and grout monopole rock anchors and foundations
- Install guy anchors and rock bolts
Outcome
Reliable mountain foundations that tied renewable generation into the regional grid.